JSW Energy Commissions 85 MW RE Capacity; Installed Capacity Stands at 13.3 GW

JSW Energy commissions 85 MW renewable energy including solar and wind, total capacity now 13,295 MW
JSW Energy adds 85 MW of new renewable capacity, increasing its total installed capacity to 13,295 MW.

Last Updated on November 17, 2025 by Author

JSW Energy Limited (The Company) announced that it has successfully commissioned 85 MW of renewable energy capacity, with solar capacity of 74 MW (Including part of the NHPC Hybrid Project) and wind capacity of 11 MW, taking the installed capacity to 13,295 MW.

The share of renewables in the overall capacity stands at 57% constituting wind capacity at 3,720 MW, solar capacity at 2,286 MW, and hydro capacity at 1,631 MW.

JSW Energy has a total locked-in generation capacity of 30.5 GW, comprising 13.3 GW operational, 12.5 GW under-construction across thermal and renewable, 150 MW under-acquisition hydro, and has a pipeline of 4.6 GW.

The company also has 29.4 GWh of locked-in energy storage capacity through hydro pumped storage projects of 26.4 GWh anda battery energy storage system of 3.0 GWh. The Company aims to reach 30 GW of generation capacity and 40 GWh of energy storage capacity by FY 2030 and achieve Carbon Neutrality by 2050.

Exit mobile version