Q. How has plant construction changed in the last 5 years?
- Major transformations due to AI, automation, modular construction, and prefabrication.
- Emphasis on sustainability: electric heavy machinery, green materials, and efficient water/waste systems.
- 3D simulations and IoT-based energy management are now common.
- Skilled workforce shortage is a key challenge.
- Nuberg EPC is leveraging technology and sustainability to lead this transformation.
Q. How do you manage coordination between engineering, procurement, and construction teams?
- Use of centralized project management and tools like Primavera.
- Modular and skid-mounted construction enhances efficiency.
- In-house manufacturing in Gujarat strengthens timelines.
- Real-time communication across teams ensures alignment and rapid response to changes.
Q. What safety standards are followed and how is compliance ensured?
- Complies with OSHA standards; zero-accident record since 1996.
- Mandatory PPE, training, emergency preparedness, regular audits.
- AR/VR for safety training and risk assessment.
- Safety is integrated into corporate culture.
Q. How do you ensure compliance with international and local regulations?
- Over 60 turnkey projects in 32 countries; deep regulatory expertise.
- ISO, ASME, U Stamp, and IBR compliance; LEED and Estidama in the UAE.
- EIA, pollution control, wildlife conservation, and stakeholder engagement.
- Uses BIM and environmental protection strategies integrated in planning.
Q. How do you maintain positive client relationships during project challenges?
- Transparent communication and proactive engagement.
- Collaboration with clients during delays (e.g., due to weather or supply issues).
- Regular reports and clear action plans maintain trust.
Q. What strategies are used to manage procurement and minimize delays?
- Early requirement definition, strong supplier relationships, and quality checks.
- Logistics coordination, real-time procurement tracking software.
- Risk management addressing geopolitical, currency, and regulatory risks.
Q. Describe a challenging project and how it was handled.
- Chlor-alkali plant in Egypt during COVID-19.
- Chartered flights for engineers to avoid delays.
- Navigated diverse regulations with local authority collaboration.
- Delivered project on time through strategic planning and adaptability.
Q. How is waste managed during construction?
- Follows waste hierarchy: prevention, reuse, recycle, recover, dispose.
- Segregation zones, reuse of concrete debris, recycling of steel scrap.
- Hazardous waste handled by certified channels.
- Community engagement and continuous improvement in waste management practices.
Q. How do you apply your skills in executing large-scale projects?
- Integrated approach across project lifecycle.
- Advanced project tracking, safety-first culture, and in-house manufacturing.
- Optimized designs for cost control and client satisfaction.
- End-to-end EPC solutions position Nuberg EPC as a reliable global leader.